Safety-Reports Administrator Dashboard Examples
Inspections
Training
JSA
Observations
Incidents
Scan
Forms
Last 7 Days
Last 30 Days
Last 12 Months
04/01/2024 - 03/31/2025
Inspection Dashboard Sample
Total
Inspections
379
TREND
18%
Positive
Observations
2,973
TREND
26%
Negative
Observations
1,315
TREND
50%
Total
Observations
4,288
TREND
36%
Observations
Report Score:
69%
# Inspections vs Report Score
--All Checklist--
Ad Hoc Checklist
Ag Industry Checklist
Best Practice Audit
Construction - 1926
Construction - 1926 ES
Construction - CalOSHA
Construction - CalOSHA ES
Construction - WISHA
COVID-19 Checklist
COVID-19 Checklist (CalOSHA)
COVID-19 Healthcare ETS - CalOSHA
COVID-19 Healthcare ETS - Federal
DOT-FMCSA - 49 CFR
Ergonomics - Industrial
Ergonomics - Office
Gen. Ind. - CalOSHA
Gen. Ind. - CalOSHA ES
General Ind. - 1910
General Ind. - 1910 ES
Incident Report
Long Term Care Facility CMS Checklist
Longshoring - 1918
Marine Terminals - 1917
Maritime - 1915
Mining and Tunneling - CalOSHA
MIOSHA
MSHA - Surface Mining
MSHA - Underground Mining
Office Safety - CalOSHA
Office Safety - Federal
Power Generation - 1910
Process Safety Mgmt
Rain Event Checklist
USACE EM 385
Top 5 Categories (Of Issues)
~
Top 10 Negative Observations
Sub-Category
Count
1
Asbestos
Employer does not/cannot assure that employees are not exposed to more than 0.1 fibers per cubic centimeter of air for an 8 hour TWA (1926.1101)
30
2
Asbestos
Employees may be exposed to the excursion limit of more than 1.0 fibers per cubic centimeter of air for as averaged over 30 min. sampling period (1926
16
3
Concrete/Masonry
Rebar is not adequately guarded to eliminate impalement hazard (reference 1926.701)
12
4
Confined Space
The worksite is not adequately evaluated and/or permit spaces have not been identified with signage (1926.1203)
12
5
Concrete/Masonry
Handles on concrete buggy extend beyond wheel width (1926.702)
11
6
Behaviors
Workers observed not keeping eyes on path (i.e. did not look in direction of travel)
11
7
Behaviors
Workers observed not looking back prior to stepping backwards
11
8
Confined Space
Site has hazards requiring a determination for Permit-Required Confined Spaces, and plan or precautions are not in place, or inadequate for these spac
11
9
Electrical Safety
Electrical equipment not installed/used as listed or labeled (1926.403)
10
10
Aisleways
There is insufficient aisle width for pedestrians and forklifts (1910.22)
10
~
1
Asbestos
Employer assures that employees are not exposed to more than 0.1 fibers per cubic centimeter of air for an 8 hour TWA (1926.1101)
32
2
Electrical Safety
Electrical equipment installed/used as listed or labeled (1926.403)
31
3
Electrical Safety
Ground pins are attached to electrical cords (i.e. extension cords and/or flexible cord sets) (1926.404)
25
4
Concrete/Masonry
Rebar is guarded to eliminate impalement hazard (reference 1926.701)
25
5
Electrical Safety
GFCI is used for temporary power connections (1926.404)
24
6
Fall Protection
Suitable fall protection is provided and used at unprotected sides/edges when working 6 feet or more above lower level (1926.501)
24
7
Confined Space
The worksite is evaluated and permit spaces are identified with signage (1926.1203)
21
8
Electrical Safety
Cord sets and/or Power Supply cords are used per Listing (i.e. not interconnected or "daisy chained") (1926.403)
18
9
Concrete/Masonry
Power/rotating troweling machines are equipped with auto shut-off when hands removed (1926.702)
18
10
Concrete/Masonry
Workers avoid working under concrete buckets (1926.701)
16
Inspections by Company
Average Score by Company
Inspections by Inspector
Average Score by Inspector
eCAT Dashboard
Use this dashboard To analyze your Corrective Action Tracking.
91%
Open
0%
Pending
8%
Closed
Average Days
Open
154
Average Days
to Close
8
Average Days Open
- All open/closed/pending items are included in this count.
Average Days to Close
- Only "Closed" action items are included in this count
04/01/2024 - 03/31/2025
Open:
1,111
Pending:
2
Closed:
103
04/01/2024 - 03/31/2025
Open
Pending
Closed
% Closed
APR 2025
1
0
1
50%
MAR 2025
81
0
14
15%
FEB 2025
99
0
17
15%
JAN 2025
54
0
10
16%
DEC 2024
12
0
1
8%
NOV 2024
21
0
3
13%
OCT 2024
106
0
11
9%
SEP 2024
596
0
6
1%
AUG 2024
27
2
14
33%
JUL 2024
25
0
7
22%
JUN 2024
34
0
8
19%
MAY 2024
27
0
2
7%
APR 2024
28
0
9
24%