Safety-Reports Administrator Dashboard Examples
Inspections
Training
JSA
Observations
Incidents
Scan
Forms
Last 7 Days
Last 30 Days
Last 12 Months
12/25/2024 - 12/24/2025
Inspection Dashboard Sample
Total
Inspections
608
TREND
108%
Positive
Observations
3,553
TREND
46%
Negative
Observations
1,390
TREND
22%
Total
Observations
4,943
TREND
38%
Observations
Report Score:
72%
# Inspections vs Report Score
--All Checklist--
Ad Hoc Checklist
Ag Industry Checklist
Best Practice Audit
Construction - 1926
Construction - 1926 ES
Construction - CalOSHA
Construction - CalOSHA ES
Construction - WISHA
COVID-19 Checklist
COVID-19 Checklist (CalOSHA)
COVID-19 Healthcare ETS - CalOSHA
COVID-19 Healthcare ETS - Federal
DOT-FMCSA - 49 CFR
Ergonomics - Industrial
Ergonomics - Office
Gen. Ind. - CalOSHA
Gen. Ind. - CalOSHA ES
General Ind. - 1910
General Ind. - 1910 ES
Incident Report
Long Term Care Facility CMS Checklist
Longshoring - 1918
Marine Terminals - 1917
Maritime - 1915
Mining and Tunneling - CalOSHA
MIOSHA
MSHA - Surface Mining
MSHA - Underground Mining
Office Safety - CalOSHA
Office Safety - Federal
Power Generation - 1910
Process Safety Mgmt
Rain Event Checklist
USACE EM 385 (2014)
USACE EM 385 (2024)
Top 5 Categories (Of Issues)
~
Top 10 Negative Observations
Sub-Category
Count
1
Asbestos
Employer does not/cannot assure that employees are not exposed to more than 0.1 fibers per cubic centimeter of air for an 8 hour TWA (1926.1101)
48
2
Concrete/Masonry
Rebar is not adequately guarded to eliminate impalement hazard (reference 1926.701)
29
3
Behaviors
Workers observed not keeping eyes on path (i.e. did not look in direction of travel)
22
4
Electrical Safety
Cord sets and/or Power Supply cords are "daisy chained" (1926.403)
21
5
Electrical Safety
GFCI is not used on all temporary power connections (1926.404)
19
6
Electrical Safety
Electrical equipment not installed/used as listed or labeled (1926.403)
19
7
Asbestos
All workers are not adequately informed of the existence (i.e. regulated areas) and/or requirements of asbestos on multi-employer worksites (1926.1101
15
8
Behaviors
Workers observed not looking back prior to stepping backwards
15
9
Concrete/Masonry
Handles on concrete buggy extend beyond wheel width (1926.702)
14
10
Aisles/Walkways
Not all aisles and walkways are kept clean and orderly (1910.22)
14
~
1
Electrical Safety
Electrical equipment installed/used as listed or labeled (1926.403)
76
2
Electrical Safety
Ground pins are attached to electrical cords (i.e. extension cords and/or flexible cord sets) (1926.404)
72
3
Electrical Safety
GFCI is used for temporary power connections (1926.404)
61
4
Fall Protection
Suitable fall protection is provided and used at unprotected sides/edges when working 6 feet or more above lower level (1926.501)
54
5
Fall Protection
Workers utilize PFA system when working near unprotected sides/edges 6 feet or more above lower level or under 6 feet if policy dictates (1926.501)
41
6
Electrical Safety
Electrical equipment is free from recognized hazards and maintained in good working order as intended by the manufacturer (1910.303)
41
7
Fall Protection
Steps have been taken (i.e. barricades, covers, warning lines, etc.) and are adequate to protect workers from falling through holes, skylights, roof h
40
8
Electrical Safety
Flexible cords are maintained in good condition (1926.416)
38
9
Electrical Safety
Cord sets and/or Power Supply cords are used per Listing (i.e. not interconnected or "daisy chained") (1926.403)
37
10
Confined Space
The worksite is evaluated and permit spaces are identified with signage (1926.1203)
35
Inspections by Company
Average Score by Company
Inspections by Inspector
Average Score by Inspector
eCAT Dashboard
Use this dashboard To analyze your Corrective Action Tracking.
84%
Open
0%
Pending
15%
Closed
Average Days
Open
160
Average Days
to Close
3
Average Days Open
- All open/closed/pending items are included in this count.
Average Days to Close
- Only "Closed" action items are included in this count
12/25/2024 - 12/24/2025
Open:
1,110
Pending:
3
Closed:
202
12/25/2024 - 12/24/2025
Open
Pending
Closed
% Closed
DEC 2025
25
0
6
19%
NOV 2025
29
0
11
28%
OCT 2025
67
2
16
19%
SEP 2025
74
0
16
18%
AUG 2025
258
0
37
13%
JUL 2025
82
0
24
23%
JUN 2025
107
0
17
14%
MAY 2025
134
1
16
11%
APR 2025
87
0
19
18%
MAR 2025
88
0
14
14%
FEB 2025
99
0
17
15%
JAN 2025
60
0
9
13%
DEC 2024
0
0
0
0%